Loading 3D scene…
How to watch and interact
Autoplay
The camera follows the story in a two-minute loop. Playback pauses when the scene leaves the screen and resumes when it comes back into view.
Jump to a chapter
Select a chapter button below the scene.
Rotate the view
Drag within the scene. After 20 seconds without input, the camera returns to the demo.
Add an incident
Click a building in the business park to trigger an incident in that zone. AI then coordinates a response.
Pause and seek
Press Space to pause. Use ←/→ to rewind or skip forward 5 seconds.
Full screen
Select Full screen. Use the scroll wheel to zoom and Esc to exit.
Mobile
The 3D scene also runs on mobile; switch to video if it cannot run smoothly. 3D uses more battery on mobile devices.
One business park, five zones
A transformer at the zone C substation keeps getting hotter. Over two minutes, the demo detects the change, identifies the affected equipment and production lines, coordinates people, robots and equipment, restores power after the work is complete, and reviews each step.
Operating metrics and dispatch records appear on the right, with coordination cards below. All assessments and commands are issued from these cards.
Eight chapters
Matching the chapter buttons below the scene
- 0:00OpeningThe camera flies over the logistics area and production workshops. Site sensors connect one by one, with watch duties assigned across safety, inspection, personnel, energy use and other specialist functions.
- 0:12SensingThe zone C transformer temperature passes its threshold and continues rising. Lindos OS receives the report and starts its assessment.
- 0:15AssessmentThe system links the transformer to its substation and the zone B production line. It compares similar past work orders, identifies a high risk and splits the response into four parallel actions.
- 0:22DispatchZone C is closed and workers evacuate to an assembly point. Backup power is insufficient, so air conditioning and lighting loads in zone D are reduced. The nearest electrician, Alex Wong, holds only a low-voltage qualification, so Daniel Tan, who holds a high-voltage qualification, is assigned instead. A temporarily parked lorry blocks the road, prompting an inspection robot to reroute. A smoke sensor in zone C registers a trace reading; aerial thermal imaging confirms there is no open flame.
- 0:44InspectionThe inspection robot arrives and uses infrared imaging to locate a hot connector, assessing it as degraded. An AGV brings spare parts from the zone A warehouse.
- 0:52CoordinateDaniel arrives. A body-worn camera streams a first-person view; AI video analysis spots that the earthing lead is not yet connected and issues a voice reminder. Once earthing, voltage testing and lockout/tagout are complete, Daniel replaces the connector. A repeat temperature check returns to normal.
- 1:16RecoveryPower is restored in zone C, the zone D load returns to normal and the closure is lifted. The robot returns and evacuated staff go back to their posts.
- 1:28ReviewCoordination cards present the review findings and key figures. The report is also shared with Site Operations via WhatsApp.
More scenarios
Loading 3D scene…
Demo video · 1:00A queue at station A: new collection jobs go to station BWaste collection dispatch →Start with one site and one workflow
contact@lindos.cn
Deploy into your existing site without rewiring, alterations or interrupting operations. Tell us which workflow you want to improve first. Together, we will agree the available data, initial scope and measures of success.
Talk to us
Tell us about your site and the workflow you want to improve. We will arrange a conversation to agree how to get started.
contact@lindos.cn →02Request information
Explore solutions for your industry, the sensors involved and a practical starting scope.
contact@lindos.cn →03Partner with us
Develop and deliver a joint solution with clearly agreed roles and responsibilities.
contact@lindos.cn →